Use the template scheduler when:

  • you are scheduling multiple divisions of the same size. (smaller divisions are scheduled over the same number of weeks as the larger division so the smaller division teams will get byes)
  • all teams play in every timeslot (you can spread matches over a single timeslot e.g. in 1 hour intervals using the template scheduler)
  • up to 24 teams per division
  • can be used with MASS UPDATE afterwards
  • you are scheduling inter-division matches (the advanced scheduler does not create inter-division matches)

Use the advanced scheduler when:

  • you are scheduling multiple divisions of different sizes
  • supports any size division
  • teams don't have to play in every timeslot
  • teams have different availability

If you already have a schedule:

then you can manually enter them or upload them from a spreadsheet

Did this answer your question?